Publication:
An Application: A Model with Sequence Dependent Setup Times for Parallel Machines for the Die House Station in a White Goods Manufacturing Company

cris.virtual.department#PLACEHOLDER_PARENT_METADATA_VALUE#
cris.virtual.orcid#PLACEHOLDER_PARENT_METADATA_VALUE#
cris.virtualsource.department0146f0e8-4ee3-4fd3-b9fa-d229e03405e5
cris.virtualsource.orcid0146f0e8-4ee3-4fd3-b9fa-d229e03405e5
dc.contributor.affiliationTürk Hava Kurumu Üniversitesi, Mühendislik Fakültesi, Endüstri Mühendisliği Bölümü, Ankara, Türkiye Türk Hava Kurumu Üniversitesi, Mühendislik Fakültesi, Endüstri Mühendisliği Bölümü, Ankara, Türkiye Türk Hava Kurumu Üniversitesi, Mühendislik Fakültesi, Endüstri Mühendisliği Bölümü, Ankara, Türkiye Türk Hava Kurumu Üniversitesi, Mühendislik Fakültesi, Endüstri Mühendisliği Bölümü, Ankara, Türkiye
dc.contributor.authorSelin KASIMOĞLU Gülce DEMİR Berrak Pınar YAZ Durdu Hakan UTKU
dc.date.accessioned2024-07-11T10:49:22Z
dc.date.available2024-07-11T10:49:22Z
dc.date.issued2021
dc.description.abstractExcessive buffer inventory may disrupt production and constitute one of the mainproblems. One of the ways of coping with the inventory problems in the massproduction lines is to achieve and implement a detailed production schedule. Inthis study, a company with a mass production line in the die house station of awhite goods sector is in consideration. A mixed-integer programming model withsequence-dependent setup times has been developed to solve the excessive work inprocess problems for the dye house station. The developed model has been appliedto the company to test the model by using real data and the problem has beensolved by using the General Algebraic Modeling System (GAMS) CPLEX 24,1solver. The optimal solution is obtained in 10 hours and 3 minutes. In the solution,the total earliness and tardiness time for 30 jobs is 4299 minutes.
dc.description.doi10.47495/okufbed.779834
dc.description.endpage44
dc.description.issue1
dc.description.startpage33
dc.description.volume4
dc.identifier.eissn2687-3729
dc.identifier.urihttps://acikarsiv.thk.edu.tr/handle/123456789/2014
dc.language.isoeng
dc.relation.journalOsmaniye Korkut Ata Üniversitesi Fen Bilimleri Enstitüsü Dergisi (Online)
dc.titleAn Application: A Model with Sequence Dependent Setup Times for Parallel Machines for the Die House Station in a White Goods Manufacturing Company
dc.typeMakale
dc.typeAraştırma Makalesi
dspace.entity.typePublication

Files

Original bundle

Now showing 1 - 1 of 1
Thumbnail Image
Name:
91.pdf
Size:
473.97 KB
Format:
Adobe Portable Document Format

Collections